Skip to content
Support
Technical answers, documentation and shipping status — from the engineers who build the systems, not a call centre. Most questions are answered the same working day.
Start Here
Absorption data, NRC / αw values, which panel suits which room, and how a build-up performs at low frequency.
Transit times by sea, rail and air, container loading, customs documents and how to track a shipment.
Datasheets, installation guides, CAD and BIM files, test reports and certificates for the exact panel.
Special sizes, colours, printed faces and perforation patterns, plus private-label packing for distributors.
Talk to Us
Send a drawing, a panel schedule or a photo of the space. For after-sales issues, include the order number and photos so we can start the same day.
Office hours: Monday–Friday, 09:00–18:00 GMT+8 · replies usually within one working day.
Quick Answers
The full list — product, acoustic and service questions — is on the FAQ page.
Still stuck? Read all FAQs or send the question to an engineer.
After the Order
Fixing schedules, shop drawings and step-by-step guides for every system. For complex ceilings and acoustic doors we review your installer’s method statement before the panels ship.
Photograph the pallet, the packing list and the affected panels within 7 days of delivery and send them with the order number. Replacements for transit damage are produced on the next available run.
Colour and perforation records are kept against your order, so repeat panels match the original batch. Ask for the same build-up reference when reordering.
Tell us the space, the build-up and the deadline. You will get the specification, the documents that apply and a price — in one reply.